Danışment Marketplace Solar Power Plant 340 kWe / 372 kWp
27 September 2024

Süre :
Unit / Directorate : Directorate of Research and Development
Start Date : 01 January 2018
End Date : 01 March 2018

Production Start Date:01 March 2018


DANIŞMENT MARKETPLACE SPP facility was installed on 01/2018 The installation process was completed and production started on 03/2018.

In our facility where it was installed 1378 solar panels were used. An average annual electricity production of 454.11 MWh is expected in our facility.

An average of 11352 trees were saved annually with the clean energy produced, and approximately 250 tons of CO₂ emissions are prevented. In addition, clean energy is produced to meet the electricity needs of 90 households annually.


Project Location