Hürriyet Pazar Yer Solar Power Plant 648 kWe / 712 kWp
27 September 2024

Süre :
Unit / Directorate : Directorate of Research and Development
Start Date : 01 January 2018
End Date : 01 March 2018

Production Start Date:01 March 2018


Our HÜRRİYET MARKETPLACE SPP facility was installed on 01/2018 The installation process was completed and production started on 03/2018.

In our facility where it was installed 2640 solar panels were used. An average annual electricity production of 872.35 MWh is anticipated in our facility.

An average of 21810 trees were saved annually with the clean energy produced, and approximately 480 tons of CO₂ emissions are prevented. In addition, clean energy is produced to meet the electricity needs of 174 households annually.