İldem Market Place Solar Power Plant 380 kWe / 417 kWp
27 September 2024

Süre :
Unit / Directorate : Directorate of Research and Development
Start Date : 01 January 2018
End Date : 01 March 2018

Production Start Date: 01 March 2018


Installation of our İLDEM PAZARYE SPP facility started on 01/2018 The installation process was completed and production started on 03/2018.

1548 in our facility where it was installed solar panels were used. An average annual electricity production of 511.48 MWh is expected in our facility.

An average of 12787 trees were saved annually with the clean energy produced, and approximately 281 tons of CO₂ emissions are prevented. In addition, clean energy is produced to meet the electricity needs of 102 households annually.