Keykubat Marketplace Solar Power Plant 287 kWe / 325 kWp
27 September 2024

Süre :
Unit / Directorate : Directorate of Research and Development
Start Date : 01 July 2016
End Date : 01 October 2016

Production Start Date:01 October 2016


Our KEYKUBAT MARKETPLACE SPP facility was installed on 07/2016 The installation process was completed and production started on 10/2016.

In our facility where it was installed 1250 solar panels were used. An average annual electricity production of 381.23 MWh is anticipated in our facility.

An average of 9530 trees were saved annually with the clean energy produced, and approximately 210 tons of CO₂ emissions are prevented. In addition, clean energy is produced to meet the electricity needs of 76 households annually.