Production Start Date:01 September 2017
MUNICIPALITY SERVICE BUILDING The installation of our solar power plant started on 06/2017 and the installation process was completed on 09/2017. /p>
441 solar panels panel was used. An average annual electricity production of 103.94 MWh is expected in our facility.
An average of 2600 trees were saved annually with the clean energy produced, resulting in approximately 58 tons of CO₂ emissions. is blocked. In addition, clean energy is produced to meet the electricity needs of 20 households annually.